Stage 1
Excavation and forms set for reinforced concrete perimeter foundation walls.

Stage 2
Tied steel rebar grid, aggregate base compaction, and sub-slab prep.

Stage 3
Fresh structural concrete pour screeded and leveled across footings.

Stage 4
Cured high-strength concrete foundation ready for superstructure load.
Key Specifications
- •Precision trenching and laser-graded stone bedding
- •Grade 60 structural rebar placement
- •4,000 PSI fiber-reinforced ready-mix concrete
- •Integrated vapor barriers and perimeter drainage
Scope of Work
- •Site excavation & grading
- •Formwork fabrication and bracing
- •Rebar placement & inspection compliance
- •Vibratory compaction and hand trowel finishing
Materials Installed
- •4000 PSI Air-Entrained Concrete
- •#4 & #5 Grade 60 Epoxy Rebar
- •15 Mil Polyethylene Vapor Barrier
- •Clean 2A Crushed Stone Sub-base
Client Result & Outcome
Level structural foundation certified for zero settlement and long-term durability.